As part of the Equipment process, your site can choose to document their equipment inventory with an equipment plan, in which equipment items are represented on CAD floor plan drawings. To create an equipment plan, a CAD specialist needs to add equipment asset symbols to the existing floor plan drawings.
Typically, someone at your site will have already defined equipment standards and other background data about the facility. The CAD specialist should have previously defined equipment blocks and developed a CAD room plan.
Equipment is represented on the Equipment (EQ) asset layer and are registered to the Equipment (EQ) table.
See Also
Adding Blocks to Floor Plan Drawings
Creating Asset Symbols by Asset Inserting
Creating Asset Symbols by Populating