Suppose a company needs departments with different skills, but all belonging to the same business unit, to work closely together on the same product as a team. The team must be located on Floor 1 (the ground floor) in order to facilitate equipment and product transportation. To model this situation, you can develop a portfolio scenario that groups these departments as a functional group. In this example, you will determine if all departments of the Manufacturing business unit can fit on SRL-01 and the re-locations that must take place in order for there to be space on SRL-01.
When you create a portfolio scenario at the functional group level, the system automatically generates a linked space requirement of the same name. Therefore, you do not need to move to the Define Space Requirements task, as you do in Example 1 and Example 2. The system has already created the space requirement to which you can now add space requirement items.
Now that you have cleared other departments from SRL-01 and placed the Manufacturing functional group, you can see that the departments of the Manufacturing business unit can easily fit here. By grouping into a functional group all of the Manufacturing departments that were not located on Floor 1, you were able to work with them all at once with one stack element.
Copyright © 1984-2016, ARCHIBUS, Inc. All rights reserved. |